T1 - A Closed Queueing Networks Approach for an Optimal Heterogeneous Fleet Size of an Inter-Facility Bulk Material Transfer System
AU - Amjath, Mohamed
AU - Kerbache, Laoucine
AU - Smith, James Mac Gregor
N1 - Publisher Copyright:
© 2024 by the authors.
PY - 2024/3
Y1 - 2024/3
N2 - Background: This study addresses optimising fleet size in a system with a heterogeneous truck fleet, aiming to minimise transportation costs in interfacility material transfer operations. Methods: The material transfer process is modelled using a closed queueing network (CQN) that considers heterogeneous nodes and customised service times tailored to the unique characteristics of various truck types and their transported materials. The optimisation problem is formulated as a mixed-integer nonlinear programming (MINLP), falling into the NP-Hard, making exact solution computation challenging. A numerical approximation method, a modified sequential quadratic programming (SQP) method coupled with a mean value analysis (MVA) algorithm, is employed to overcome this challenge. Validation is conducted using a discrete event simulation (DES) model. Results: The proposed analytical model tested within a steel manufacturing plant’s material transfer process. The results showed that the analytical model achieved comparable optimisation of the heterogeneous truck fleet size with significantly reduced response times compared to the simulation method. Furthermore, evaluating performance metrics, encompassing response time, utilisation rate, and cycle time, revealed minimal discrepancies between the analytical and the simulation results, approximately ±8%, ±8%, and ±7%, respectively. Conclusions: These findings affirm the presented analytical approach’s robustness in optimising interfacility material transfer operations with heterogeneous truck fleets, demonstrating real-world applications.
AB - Background: This study addresses optimising fleet size in a system with a heterogeneous truck fleet, aiming to minimise transportation costs in interfacility material transfer operations. Methods: The material transfer process is modelled using a closed queueing network (CQN) that considers heterogeneous nodes and customised service times tailored to the unique characteristics of various truck types and their transported materials. The optimisation problem is formulated as a mixed-integer nonlinear programming (MINLP), falling into the NP-Hard, making exact solution computation challenging. A numerical approximation method, a modified sequential quadratic programming (SQP) method coupled with a mean value analysis (MVA) algorithm, is employed to overcome this challenge. Validation is conducted using a discrete event simulation (DES) model. Results: The proposed analytical model tested within a steel manufacturing plant’s material transfer process. The results showed that the analytical model achieved comparable optimisation of the heterogeneous truck fleet size with significantly reduced response times compared to the simulation method. Furthermore, evaluating performance metrics, encompassing response time, utilisation rate, and cycle time, revealed minimal discrepancies between the analytical and the simulation results, approximately ±8%, ±8%, and ±7%, respectively. Conclusions: These findings affirm the presented analytical approach’s robustness in optimising interfacility material transfer operations with heterogeneous truck fleets, demonstrating real-world applications.
KW - fleet sizing
KW - heterogeneous fleet
KW - material handling
KW - queueing networks
KW - simulation
UR - http://www.scopus.com/inward/record.url?scp=85188904638&partnerID=8YFLogxK
U2 - 10.3390/logistics8010026
DO - 10.3390/logistics8010026
M3 - Article
AN - SCOPUS:85188904638
SN - 2305-6290
VL - 8
JO - Logistics
JF - Logistics
IS - 1
M1 - 26
ER -