Intelligent water drops algorithm on parallel machines scheduling

Vahid Kayvanfar, Ehsan Teymourian, Koorosh Mashhadi Alizadeh

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

6 Citations (Scopus)

Abstract

Maximum completion time so called makespan as well as earliness and tardiness penalties are simultaneously minimized on parallel machines in this paper. An intelligent water drops (IWD) algorithm as a new swarm-based nature inspired optimization one is presented and applied to solve this problem. Experimental results show the superiority of the employed IWD method.

Original languageEnglish
Title of host publicationIEOM 2015 - 5th International Conference on Industrial Engineering and Operations Management, Proceeding
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9781479960651
DOIs
Publication statusPublished - 23 Apr 2015
Externally publishedYes
Event5th International Conference on Industrial Engineering and Operations Management, IEOM 2015 - Dubai, United Arab Emirates
Duration: 3 Mar 20155 Mar 2015

Publication series

NameIEOM 2015 - 5th International Conference on Industrial Engineering and Operations Management, Proceeding

Conference

Conference5th International Conference on Industrial Engineering and Operations Management, IEOM 2015
Country/TerritoryUnited Arab Emirates
CityDubai
Period3/03/155/03/15

Keywords

  • Earliness and tardiness
  • Intelligent water drops (IWD)
  • Makespan
  • Parallel machines

Fingerprint

Dive into the research topics of 'Intelligent water drops algorithm on parallel machines scheduling'. Together they form a unique fingerprint.

Cite this