Abstract
This study aims to investigate and quantify the performance of Green Infrastructure (GI) to reduce potential flooding in Texas. A sub-hourly 15-min time step SWAT model- to increase the accuracy of simulations- was applied to estimate flows and evaluate flooding in the Blunn Creek Watershed. Bioretention and permeable pavement were represented in the SWAT model by modifying the routine of a current sedimentation filtration design. The evaluation of flooding was based on a percentage of flows exceeding the bank-full level. Results showed that combining bioretention and the permeable pavement had the greatest reductions in peak discharges for all recurrence intervals (2-year, 10-year, 25-year and 100-year). Permeable pavement had the least percentage of reductions for all recurrence intervals. All GI practices had 100% reduction in the percentage of exceedance for bankfull flows for the 2-year recurrence intervals. The same trend continued to hold and combining bioretention and permeable pavement resulted in the greatest potential reductions in the percentage of exceedance of bankfull flows.
Original language | English |
---|---|
Journal | International Journal of Earth & Environmental Sciences2456-351X |
Publication status | Published - 22 Sept 2018 |
Externally published | Yes |