Multi objective two-stage assembly flow shop with release time

Shaya Sheikh*, G. M. Komaki, Vahid Kayvanfar

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

25 Citations (Scopus)

Abstract

Two-stage assembly flow shops are integral part of several manufacturing systems such as computer and engine manufacturing lines. This paper explores three objectives of makespan, total tardiness, and total completion times for two-stage assembly flow shop with release time. To the best of our knowledge, these performance measures have not been addressed simultaneously in assembly flow shops. We derive polynomial optimal solutions for special cases of this problem with a single objective and then develop heuristics with promising starting solutions for the multi-objective case. Due to NP-hardness of the problem, we apply a customized reference-based Non-dominated Sorting Genetic Algorithm (NSGA-III) and Multi-Objective Particle Swarm Optimization (MOPSO) as solution procedures. Finally, we present extensive computational analysis to compare the performance of employed heuristic and metaheuristics on randomly generated instances. Results show that both NSGA-III and MOPSO generate competitive solutions for the presented problem. However, NSGA-III generates significantly better results than MOPSO based on one of the three performance metrics.

Original languageEnglish
Pages (from-to)276-292
Number of pages17
JournalComputers and Industrial Engineering
Volume124
DOIs
Publication statusPublished - Oct 2018
Externally publishedYes

Keywords

  • Assembly flow shop
  • MOPSO
  • Multi-objectives
  • NSGA-III

Fingerprint

Dive into the research topics of 'Multi objective two-stage assembly flow shop with release time'. Together they form a unique fingerprint.

Cite this